Project Update 8/23/2011

The project team has completed 6 out of 9 locations for pedestrian, bicycle and wheelchair movements and volume.  The nine locations include:  Keystone, Evans, Sutro, Galletti, El Rancho, 12th Street, Shriver, McCarran, and Sparks Boulevard.  Below is a summary of the first 6 locations to be studied.  The remaining three locations (El Rancho, 12th, and Shriver) will be conducted once Washoe County School District traditional tracks are back in school.  This information will assist the team in determining overall pedestrian, bicycle, and wheelchair volumes and general movements throughout the corridor – establishing a baseline for future more detailed studies.

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s